WILLIAMSON COUNTY (MUNC)
ROUTE SURVEY – CHANDLER ROAD
Taylor to Round Rock, Texas
- Established GPS control network and correlated aerial flight operations with flight panel placement, aerial flight contractor was a subcontractor of BTS
- 15 miles in length
- Landowner negotiations
- Boundary surveys and parcel definitions
- Utility locates and topographic surveys of multiple drainage areas
- Parcel plat exhibits and legal descriptions
- Established GPS control network
- Established right-of-way monumentation
SAN MIGUEL ELECTRIC COPPERATIVE
- Established GPS control network
- Topographical surveys for structure designs
- Road and sedimentation pond layout
CITY OF CORSICANA
- Established GPS control network
- Surveying which supported drainage and impact studies related to existing streets and channels
- Boundary surveys
CITY OF TAYLOR
- Established GPS control network
- Multiple array of municipal projects including boundary surveying, topographic surveying, record research, pre-construction design surveying, and construction staking for:
1. Hike and Bike Trail
2. Robinson City Park
3. Murphy Park
4. Athletic Complex
5. New City Water Main line along FM 397 / Hwy 95 and Old Granger Road
CITY OF CEDAR PARK
- Design survey and Parcel Description for new Water Supply line along Williamson County Road 174 - Brushy Creek Road
CITY OF GRANGER
- Established GPS control network
- Design survey for Street Rehabilitation Project
CITY OF HOLLAND
- Established GPS control network
- Survey and infrastructure layout of new city park
|